25% increase does not sound a lot but I assume this includes current areas not used from the old terminal so perhaps 40% in real terms?
As Luton almost hit 11M at one point then this would be enough for 15M and a more efficient space usage hopefully things will flow a little better at peak times if this all comes about.
Lets hope this all goes well if planning approved and the pain of works is done without too much disruption.