Adria's timetable, now loaded to mid-June shows LTN-LJU being operated by all
A319 aircraft, rather than the current mix of A319/CRJs. A slight capacity
increase. Times remain similar.
That's interesting as according to media reports they will get rid of all Airbus gear by the end of summer schedule.