Reducing to a weight that would allow the aircraft to be stopped on the 4000m runway was also a consideration. With an already-significant fuel leak present, motoring off the end of the runway would not have been ideal. I understand D.E. spent a fair bit of time determining if sufficient runway was available and at what weight it would be, given the failures.