PPRuNe Forums - View Single Post - HEATHROW
Thread: HEATHROW
View Single Post
Old 6th Jul 2012, 04:07
  #1778 (permalink)  
FlightPathOBN
 
Join Date: Mar 2011
Location: engineer at large
Posts: 1,409
Likes: 0
Received 0 Likes on 0 Posts
Again...

For Visual and VMC, simultaneous operations are allowed if runways are at least 700 feet apart, with MVA +500 ceiling and 3nm vis.

Under IMC and IFR, the runways have to be at least 2500 feet apart for simultaneous ops. One of the approach paths will have a 3 degree offset.
FlightPathOBN is offline