Overtime for Offshore Pilots/Mechs/Crews
Question in the equal time on/off helicopter world is the "industry standard" to calculate overtime by dividing annual salary by 365 then multiplying by 1.5 or is it done by dividing salary by days scheduled to be worked (183?) then times 1.5?
In the US I have seen both ways; Union shop did the latter. Thanks in advance for any positive feedback.