I can see possible reasons for a delay
Things don't always go to plan.. rounded off fasteners on the panel, dropping a tool (loose article), u/s on fit components.
If the low oil level was caused by a leak and a componet was replaced. Wouldn't there be lengthy function tests and independant checks to be carried out?