PPRuNe Forums - View Single Post - RAF Merlin Crews Screwed
View Single Post
Old 3rd May 2012, 10:23
  #17 (permalink)  
TAC Queen
 
Join Date: Aug 2003
Location: UK
Posts: 105
Likes: 0
Received 0 Likes on 0 Posts
The light at the end of the tunnel has been switched off to save money (£0.22 annual saving).
While this cost saving measure is in place MoD has asked the defense industry to design a new lightweight multi role light bulb and has set aside a budget of 1.9 million over three years. The team will be headed by 1x 3 star and 2x 2 star and 1x 1star, these will all be new appointments and thus ensure that the HM Forces maintains more stars than cars.
TAC Queen is offline