Bit of an exaggeration to say there are similarities in runway lengths used between LTN and LCY. However, the fact is that if you're taking an AT7 out to Waterford with a slim load, in all likelihood you'll need significantly less than half of the runway before you're airborne. There's no point wasting time and fuel taxiing to the end if your SOPs allow you not to.