Yes. Most of those factors even the tea breaks (!) are already in the existing cost. Assuming it's PoW for conversion, the relevant parts of the structure haven't been fabricated yet, so assuming the design teams get cracking (particularly on the detail of the supporting structure) delay is unlikely to affect more than a small proportion of those working on the project. The electrickery elements will also require work, but again mostly in the design stage.

Project and risk mgmt teams are already in place, as is their infrastructure, ITP will largely be supplied as part of the sale and will then fall on the existing test & commissioning team.

There will be no need for anyone else to stop what they're doing while the systems are installed.

Apologies for the slightly intemperate tone last night, post beer-festival posting never a good idea......