PPRuNe Forums - View Single Post - AF 447 Thread No. 7
View Single Post
Old 10th April 2012 | 21:00
  #1344 (permalink)  
RR_NDB
10 Anniversary
 
Joined: Feb 2011
Posts: 876
Likes: 0
From: Nearby SBBR and SDAM
Time required to "help the System"

Hi,

AZR:

So, crew must help the System in this situation?

With good DSP processing of THREE sources (that always must be considered suspect) the crew could instead be "helped" by the System.

Sometimes (even on A/C) you use 5 redundant elements. E.G. in Airbus SAS design.
RR_NDB is offline