PPRuNe Forums - View Single Post - EC225
Thread: EC225
View Single Post
Old 28th March 2012 | 08:57
  #219 (permalink)  
JimL
20 Anniversary
 
Joined: May 2003
Posts: 921
Likes: 30
From: Europe
FADEC225,

Depending on the Operational Rules, the maximum mass for landing on a rig will be satisfaction of the PC2 requirements.

At the very least that will be the mass provided by the lesser of: maximum certificated take-off mass; compliance with Second Segment Climb Performance (from the clear area CAT A performance graphs); or the OEI en-route climb requirement (which is identical to PC1).

Even if your State's rules do not specify these limitations, the operator (pilot) might wish to apply them - they are not (usually) punitive.

Jim
JimL is offline  
Reply