PPRuNe Forums - View Single Post - AF447 final crew conversation - Thread No. 2
Old 7th March 2012 | 06:54
  #90 (permalink)  
llagonne66
15 Anniversary
 
Joined: Jun 2009
Posts: 119
Likes: 5
From: In one of the two main circles
Unreliable Airspeed

As QRH section 2.21 is titled "UNRELIABLE SPEED INDICATION/ADR CHECK PROCEDURE", it looks like the "air" has been added at some point of time to the "speed".

But does it change something to the AF447 story (except adding almost one page to this thread) ?
llagonne66 is offline  
Reply