Its a really interesting point though about the AKL based long-haul cabin crew.Paxing 250 AKL based crew to OZ to start every trip then paxing them back to AKL at the end of every trip
Thats a lot of seats bein taken by crew every day/week/month. And theyre must-ride as they are part of a crew pattern,how long is that suistainable?