And why would this even been considered? For the most part, they are running out of "qualified" (by their standards) first officers this summer, some time. At first, "fast tracked" f/o's, that had their contracts altered after arriving, will be evaluated. Then look at f/o's that didn't quite make EK's cut for upgrade, giving them another shot. The only solution, if criteria remains the same for upgrade is either DECs or delay of delivery of airframes (might be a possiblity with 380 wing issues).