Indeed - agree with those two as well.
I prefer the Boeing QRH to ECAM. At least you can flick through the QRH on the Boeing on long sectors for easy revision, and choose which checklist to run first on complex failures.
ECAM prevents both of those, and having some checks on paper, and some on ECAM is a pain, and makes a mockery of the ECAM philosophy.