Our system has been destroyed.Ornge came in 2006 and everything has been going down since.We are a model of inefficiency.The AW139 is a non sense for an air ambulance,we burn 60% more fuel,the level of maintenance is asthonishing,we need sometimes 3 aircraft's to get one serviceable,it is completely unsustainable with the budget cut who will come during the next 5 years.At the end,we do less than before and it all comes from Ornge
The FIPS never worked and the slip ring failure we had could have killed everybody on board.There is nothing good of having an AW139 for an Air Ambulance