@Dozey;
You are right regarding the A/P disconnect. The RTLU locked because the ADRs disagreed, and I have made an edit to post #526.
I am not going to get into the argument regarding the cause of the climb, other than to reiterate that the elevator and THS responded to the PF's SS stirring and the aircraft pitched into the climb almost immediately at 02:10:09.