PPRuNe Forums - View Single Post - QANTAS Exodus
Thread: QANTAS Exodus
View Single Post
Old 6th Nov 2011, 01:38
  #3 (permalink)  
600ft-lb
 
Join Date: Dec 2007
Location: The Bubble
Posts: 642
Likes: 0
Received 2 Likes on 1 Post
And the ExCo are getting exactly what they want. For each who leaves, the eventual redundancy payout gets smaller and smaller.

But you can't blame guys for pre-empting the inevitable, no one wants to be looking for a job along with 400 similar qualified individuals at the same time.

The Management Rowing Race


  1. Once upon a time there was a Red rowing team.
  2. This Red team agreed to hold an annual rowing race with a Green team. Each team would contain 8 men.
  3. Both teams worked really hard to get in the best shape. On the day of the first race, both teams were ready to win.
  4. FINISH The Green team won by 1 mile!
  5. The Red team was crushed in their defeat, but they were determined to win the race next year. So they established a panel of auditors to observe the situation and ascertain if there were any differences between the teams.
  6. After several weeks of detailed intelligence gathering, the auditors could find only one difference; the Green team had 7 rowers and 1 captain...
  7. … and the Red team had 7 captains and 1 rower!
  8. Un-perplexed by the raw data, upper management showed unexpected wisdom: they hired a consulting company to analyze the data and suggest a solution that would enable the Red team to win next year.
  9. After several months the consultants came to the conclusion that the ratio of captains to rowers was the problem in the Red team. Based on this analysis a solution was proposed: the structure of the Red team has to be changed!
  10. Like sharks getting the scent of reorganization blood, upper management wasted no time in restructuring the Red team into 4 Captains, led by 2 Managers, reporting to 1 Senior Director with a dotted line to the rower. Besides that, in a blaze of unrestricted inspiration, they suggested they might be inclined to improve the rower’s working environment by a non-monetary reward and recognition scheme if there was improved performance by the rower.
  11. FINISH The next year, the Green team won by 2 miles.......
  12. The Red team upper management immediately fired the rower based on his unsatisfactory performance.
  13. A bonus was paid to the Captains, Directors, and Managers for the strong leadership and motivation they showed during the preparation phase and as an incentive for them to find a better rower for the next race.
  14. The consulting company prepared a new analysis of the restructuring activity, which showed that the strategy was good, the motivation was great, the restructuring was executed correctly, but the tool used (which was not included in the original data) was sub-standard and had to be improved.
  15. Currently the Red team management is having a new boat designed; and to demostrate fiscal and HR dexterity for stockholders they also outsourced the rowing to India.
600ft-lb is offline