Denti:
Yup, the NG is certified for RNP 0.10 as standard level with only two IRS. And for GNSS based CAT I approaches, CAT IIIb is currently in the testing phase.
As I said only one IRU is required. And, as a practical matter
most presently authorized RNP AR airplanes have 3 IRUs.