PPRuNe Forums - View Single Post - EU-OPS SPO Helicopter external load
View Single Post
Old 3rd November 2011 | 16:40
  #7 (permalink)  
tecpilot
 
Joined: Jun 2001
Posts: 506
Likes: 1
From: Europe
I believe they have a lot of misspellings in the paper. Sometimes they talk about HESLO, than HELO on the same page. May be it comes from messy "copy, paste and mixing" from and with other sources. (charts and text by different authors???)

Cycle: A cycle is a flight from site A to site B with an external load and the subsequent return to site A.
What if load and sling are dropped on site B? 0,5 cycles?

Last edited by tecpilot; 3rd November 2011 at 16:51.
tecpilot is offline  
Reply