Called changing your plan, the one crossing above might not have made the level it was supposed to therefore the request for a stop off, e.g EGCC departures for higher levels going south are supposed to be 310 50nm before MID, a lot don't make it. The next sector might not have been aware at the time that the intial co-ordination was done.
Did you get 290 after passing the traffic?