Lancair safety
The safety record for Lancairs varies by model and is reflected in the insurance cost. A turbine IV-P might cost USD$15000 to 20000 annually. My ES-P is insured for less than USD$5000. The PT requires annual approved training. The ES-P does not. If you want to go fast, be prepared to train and pay for it.