I would join by whatever method the airfield publishes as their standard procedure, and in the absence of such published procedure, then carry out a standard overhead join, which will result in joining crosswind for the appropriate runway by passing over the upwind end of the runway at circuit height.
However, there have been many threads re this subject, but the above is what is recommended in the CAA safety sense leaflets.