Did anyone ever say "risk assessment" to the runway designers ?
Does anyone say “risk assessment” to the operating crews?
If a runway does not have a reasonable overrun safety area (length or condition), then perhaps the runway length available should be reduced in the pre landing (pre-operation) risk assessment.