PPRuNe Forums - View Single Post - BCFT (Bournemouth - merged 2011)
View Single Post
Old 1st Aug 2011, 22:23
  #10 (permalink)  
zondaracer
 
Join Date: Aug 2007
Location: Mare Nostrum
Age: 41
Posts: 1,427
Likes: 0
Received 0 Likes on 0 Posts
I did my training in the US in a non-JAA school, but I went to BCFT to do a CPL conversion (I did my IR conversion elsewhere). It took me 14 days, and I was able to fly 10 of those days (including the checkride), and I averaged I think less than 1.3hrs for each day that I actually flew, and this was during the summer. Since I was a conversion, I didnīt have any minimum hours to attain. If you plan on doing a CPL, plan on 25hrs (if you have already done your hour building), so probably close to a month and a half. And then your MEIR, which will probably take you another 2 months (you can normally fly if it is cloudy). That is what it seemed the other lads were taking from what I gathered.

Last edited by zondaracer; 8th Aug 2011 at 14:55. Reason: Spelling
zondaracer is offline