@CONF iture:
I know and maybe I was not clear in the question, with excuses.
I tried to figure out what would be the initial movement from the Thrust locked condition. as this was the first ECAM drill "THR LEVERS....MOVE" @ 2:10:05.
Don't think they waited untill 02:10:51 to perform the drill, so the T/L was initially moved to a position between CLB and TOGA.
if the UAS value is known, which is safe pitch/thrust relation, it would be more or less the position of the A/T N1 value with T/L in the CLB detent before the event (transient IAS speed loss) took place.
So the initial THR LEVERS.....MOVE action was movement of T/L fwd to intercept ~ 90%N1.
Thanks for info.