PPRuNe Forums - View Single Post - SAR offshore letdown procedure
View Single Post
Old 3rd Jun 2011, 17:17
  #4 (permalink)  
LZ4
 
Join Date: Mar 2008
Location: N/A
Posts: 8
Likes: 0
Received 0 Likes on 0 Posts
Thanks for the info Crab.


How much separation would be maintained to obstacles/cliffs etc. during the letdown to the cleared area. How much sea room would be required for instance in a coastal area?

Is it possible for the approaches to the cleared area to be made out of wind in the Sea King?

Regards,
LZ4.
LZ4 is offline