PPRuNe Forums - View Single Post - QANTAS A380 Uncontained failure.
View Single Post
Old 19th May 2011, 17:28
  #650 (permalink)  
bearfoil
Guest
 
Posts: n/a
vic cairns

From the article, I see the minimum value for wall thickness of this stub pipe is .5mm. Can that be correct?? It is also the minimum "crest" measurement for the splines at IP shaft rigid coupling. The AD specifies a range for splines of 0.5mm to 2.65mm, so we know the AD is correct, but 0.5mm for an oil feed pipe? I think that is about 0.045 inch?