PPRuNe Forums - View Single Post - AF 447 Search to resume (part2)
View Single Post
Old 19th May 2011, 06:00
  #1797 (permalink)  
RR_NDB
 
Join Date: Feb 2011
Location: Nearby SBBR and SDAM
Posts: 875
Likes: 0
Received 0 Likes on 0 Posts
Unpredictability

I put unpredictable because most of the design effort was put to avoid the extremes.

After the "threshold" there are a lot of extra issues. And the interface is crucial.

One thing is clear: The System manager (PF) ideally should be capable to "avoid" (WX radar use, Comm. resources use, etc.) and to properly "administrate the crisis" after a System degradation.

But the optimization of the advanced designs "comes at a price" when unexpected (or unexpectable") situations arise.

The NYU risk Engineering professor introduced the "Black Swan" concept about "the highly improbable" events. I posted earlier a mention on him.

May be this case after BEA analysis may fit.
RR_NDB is offline