PPRuNe Forums - View Single Post - AF 447 Search to resume (part2)
View Single Post
Old 30th Apr 2011, 17:30
  #373 (permalink)  
bearfoil
Guest
 
Posts: n/a
Chris Scott

I'll plod ahead, since I have no shame. The engineer appears to be working on an assembly that has bellcranks, pushrods, Hydraulic pumps, plumbing and some intricate looking mechanical architecture. Ignoring Hazelnuts at my risk as ever, if the "Strut" is the Rudder post, the assembly may be RTL. I see Hazelnuts "knee" and he could well be right, especially since I thought RTLU was in the VS. I'm better at diagrams. Then again, it could be a conduit for the Rudder hydraulics, along with the RTLU hydraulic power. Cheers.

Last edited by bearfoil; 30th Apr 2011 at 17:46.