I'm not moaning, I'm joining in a discussion and supporting my ex colleagues, many of whom are good friends.
The point is that you can be as rigid or as flexible as you like within the rules and SOPs. If everybody followed the SOPs to the letter then the whole operation would slow down. The knock on effect of a slower operation should be apparent to you.
Have you ever beed to CDG when AF are on a go slow?