To obtain a 3D position solution, at least 4 measurements are required. To detect a fault, at least 5 measurements are required, and to isolate and exclude a fault, at least 6 measurements are required, however often more measurements are needed depending on the satellite geometry. Typically there are 7 to 12 satellites in view.
Receiver Autonomous Integrity Monitoring - Wikipedia, the free encyclopedia