That sound like a brilliant design, North America engineering does not go by that they're design strategy is to meet the rule.
Even so an emergency lube system to extend the 30 minute dry run would be a nice option. Just a AMP meter in the S92 would be nice as well, would it be not nice to know where 200KW is going (nearly 300 HP).
CHW