I do wonder how close to being an operational integrated package MR4 was or how much was it going to cost and how long was it going to take to get it there. Reminds me of AEW3 back in 70's/80's.
Could I be right in thinking its not as black and white as the media are portraying it?
And how much of the flack is being directed at the RAF/Govt that should be being directed at the Contractor?