PPRuNe Forums - View Single Post - Nimrod MRA.4
Thread: Nimrod MRA.4
View Single Post
Old 1st Jan 2011, 22:27
  #1441 (permalink)  
ZH875
 
Join Date: Apr 2003
Location: Lincolnshire
Age: 64
Posts: 2,278
Received 36 Likes on 14 Posts
With care, a low loader will just about get across the hump back bridge, it has been done before, you just need a tractor unit with a bit of grunt, and some tarmac to fill the scrape holes with.
ZH875 is offline