Would you really expect the early stages of a test campaign to include the kind of parachuting activity that you have described?
No not at all. The they carried out was an entirely appropriate first test.
But the press release should have reflected the cautious conclusions that could be drawn from such a preliminary test, rather than making an impetuous extrapolation to a grandiose claim about the A400's as yet unproven capability as a paratroop aircraft.