PPRuNe Forums - View Single Post - Qantas A380 uncontained #2 engine failure
Old 5th Nov 2010, 08:18
  #343 (permalink)  
spannersatcx
 
Join Date: Dec 1998
Location: .
Posts: 2,997
Likes: 0
Received 0 Likes on 0 Posts
Cool

Originally Posted by Self Loading Freight
Qantas is saying it expects to resume A380 flights in 24 to 48 hours, following inspection.

Does that mean it knows what its looking for, and that it knows it's not a design problem?

R

(as for fixing the hole in the wing: bit of speedtape, bosh bosh, job done)
They maybe complying with an AD that is required? EASA AD
spannersatcx is offline