PPRuNe Forums - View Single Post - NAT-MNPS inflight contingency procedure
View Single Post
Old 21st October 2010 | 16:12
  #17 (permalink)  
BOAC
Per Ardua ad Astraeus
 
Joined: Mar 2000
Posts: 18,575
Likes: 4
From: UK
Thanks, Shamrock - I'm familiar with the 'conceptual' width and we normally 'offset' 1 or 2nm - it was the actual width I was after, and Mr R's post is the closest I have got. This was prompted some time back when the spacing halved and it is often difficult to execute a 180 in 15nm. The suggestion (from the '15nm' parallel rule) would be that the tracks would be probably 20nm 'wide', I guess, giving a 5nm margin? Mr R's MPNS 12.6 nm limit makes it quite close!
BOAC is offline  
Reply