think you'll find it was a rework for a fatigue extension , that due to the poor workmanship resulted in centre-section removals and reworks where repaireable , those that werent were replaced with ex F2 items. Cant remember the thread on here though. Interesting to know how much money it was planned to save by contracting the work out vs doing it in house , and what the end cost was !