PPRuNe Forums - View Single Post - final approach technique: pitch vs power
View Single Post
Old 9th Aug 2010, 17:31
  #25 (permalink)  
BEagle
 
Join Date: May 1999
Location: Quite near 'An aerodrome somewhere in England'
Posts: 26,842
Received 303 Likes on 114 Posts
However, there is quite often a time delay whilst the student reacts.
Exactly. Detection of error requires a system against which such an error can be quantified. Hence my 'error-ometer' description; using 'point and power', an ASI provides such a system if the touchdown aiming point is maintained with zero sightline spin in the windscreen.

It's also MUCH easier to teach!
BEagle is offline