PPRuNe Forums - View Single Post - S-92 gearbox crack
View Single Post
Old 4th August 2010 | 10:40
  #33 (permalink)  
industry insider
 
Joined: Sep 2006
Posts: 876
Likes: 0
From: Inside the Industry
The inspection intervals were validated by fatigue testing on an MGB testing rig using a production MGB casting with a deliberately severed foot. The test rig simulates the flight characteristics of the aircraft. The test showed the other feet MGB capable of exceeding the 10 hour flight time inspection by 7 times.
industry insider is offline  
Reply