PPRuNe Forums - View Single Post - Babblespeak, the endless checklist
View Single Post
Old 7th Jul 2010, 18:53
  #36 (permalink)  
nnc0
 
Join Date: May 2005
Location: On a good day - at sea
Posts: 263
Likes: 0
Received 0 Likes on 0 Posts
Just to clarify the checklists in question on US Air 1549, the crew were actioning the dual eng fail checklist: 3-5 pages of relight and approach preparations The ditching sequence/preparation in this procedure is towards the very end of the procedure and the landing occurred before the ditching portion could be actioned.

The stand alone DITCHING checklist is a separate checklist and was not used by the crew as it assumes both Engines operating.
nnc0 is offline