PPRuNe Forums - View Single Post - NTSB urjent action on CF6-50
View Single Post
Old 8th Jun 2010, 02:45
  #2 (permalink)  
Heracles
 
Join Date: Jan 2009
Location: Romeo 14
Posts: 49
Likes: 0
Received 0 Likes on 0 Posts
Here's the link for those interested in the original:

SB-10-20


Hot section scope every 15 cycles,, for most operators of the GE powered Classic,, thats just about every second day. I'm sure GE will assign absolutely zero priority to redesigning and certifying that new rotor, lol.

WOW
--heracles
Heracles is offline