PPRuNe Forums - View Single Post - Polish Presidential Flight Crash Thread
View Single Post
Old 20th May 2010, 15:17
  #44 (permalink)  
DeRodeKat
 
Join Date: Nov 2007
Location: Europe
Posts: 24
Likes: 0
Received 0 Likes on 0 Posts
Continuing Alice025 translation

Group 7 Execution of flight from the moment of entering aerodrome Smolensk "North" controlled zone to the beginning of the descent on the glide path

a. At their request the crew was carrying out a "trial" approach to the decision height (100 meters).
b. Upon granting the crew a permission to execute the third turn, the controller advised the crew to be ready to go around from 100 meters.
DeRodeKat is offline