PPRuNe Forums - View Single Post - Tug connection
Thread: Tug connection
View Single Post
Old 29th April 2010 | 16:43
  #15 (permalink)  
TurningFinals
 
Joined: Mar 2009
Posts: 166
Likes: 0
From: UK
require the nose wheel chocks to be removed. This should not be done on stand with engines running.
I don't think that's strictly true. Where I work we do not do pushbacks, so the aircraft starts both engines on stand with either a headset man or someone giving hand signals, the chocks are then removed and the aircraft self-maneuvers off stand with the aid of a marshaller.
TurningFinals is offline  
Reply