PPRuNe Forums - View Single Post - Atlas underbids Evergreen for future dreamlifter operation
Old 1st Mar 2010, 16:04
  #11 (permalink)  
WhaleDriver
 
Join Date: May 2000
Location: New York
Posts: 293
Likes: 0
Received 0 Likes on 0 Posts
Integrating (4) more -400s to the Atlas operation under a "CMI" contract in the greater scheme of things actually reduces the operating costs of Atlas thru greater economies of scale.
This applies if Atlas can convince Boeing to drop the requirement for dedicated crews. You are correct, if the crew can climb down from a -400 at CHS and the next day fly the LCF.
WhaleDriver is offline