EU OPS/ LVTO 150 RVR requirements
I am tring to write something on LVTO 150 Meters, but table 1 of Appendix 1 to OPS 1.430 is very ambiguos !
It seems on note 3 that RVR values can be "replaced" by Pilot assessment for "initial part of take off" in all RVR/VIS cases.
Following doubts arise :
- Is the "initial part" that part of the runway after threshold but before transmissiometer A ? (If answer is NO, why not to state "POINT A" instead?)
- As far as I know if any RVR below 200 meters, multiple RVR (A+B+C) are required by ICAO.
-The term "relevant RVR" disappeared from EU OPS / TGL 44 (it is part of rwy with speed above 60KIAS).
Thanks
Last edited by gigi116; 25th Jan 2010 at 16:07.