PPRuNe Forums - View Single Post - British Airways - CC Industrial Relations Mk V
Old 22nd Jan 2010, 10:08
  #2556 (permalink)  
keel beam
 
Join Date: Apr 2004
Location: leafy suburbs
Posts: 308
Likes: 0
Received 0 Likes on 0 Posts
Mixed cabin crew

For those of you that are looking forward to working with or flying with volunteers from Engineering, Check In, Dispatch, and loading you may be disappointed.

The training requirements to bring these groups up to the required standard is 20 days. Quite a long period for what may be a possible short strike.

Former Cabin Crew and pilots need only a couple of days, so I would think they would be the priority.


Back to my spanners
keel beam is offline