PPRuNe Forums - View Single Post - Bell 412
Thread: Bell 412
View Single Post
Old 26th Dec 2009, 19:02
  #271 (permalink)  
Buitenzorg
 
Join Date: Mar 2002
Location: West of zero
Posts: 240
Likes: 0
Received 0 Likes on 0 Posts
The aircraft is a B412SP with PT6T-3B engines. When making a power change engine 1 hunts high and low (torque, ITT and N1) about four times before settling down; engine 2 settles down after only one cycle.

Is there a prescribed minimum (either in seconds or number of cycles) before which the engine should be in a stable state? If so, where can I find it? I’ve looked through both the B412 and PT6T Maintenance Manuals and failed to find any hard data.

Thanks for any pointers.
Buitenzorg is offline