PPRuNe Forums - View Single Post - Archerfield planning new single runway
View Single Post
Old 7th Nov 2009, 23:01
  #16 (permalink)  
2b2
 
Join Date: Apr 2004
Location: Oz
Posts: 87
Received 7 Likes on 3 Posts
It is a possibility that the 04/22 complex could be realigned to fall more into line with prevailing wind patterns and if that was to occur, then it may be possible to seal one runway to avoid it being NOTAM’d out due to soft wet surface

This will be the key to the new masterplan -

a) a new 04/22 complex (i.e. 2 runways), one of which will be sealed

or

b) one sealed runway to replace the two 04/22 runways

ask anyone at Jandakot how well a single runway works in a GAAP training environment. 2 or 3 at a time in the circuit max??
2b2 is offline